With an increased demand for the construction of new rail networks and upgrading the existing lines to handle larger traffic volumes, technical complexities have surged for the professionals engaged in design and construction roles. While reliable estimates are necessary for evaluating various design alternatives, it is equally or more important for contractors and other agencies involved to get the railway track cross-section drawings and actual materials used during construction. Railway track-laying projects have complex preparation work, including road recreation, trackwork, underground utilities, and much more. This rail transportation laying work requires a lot of relocation and relaying of utilities and services.